Participatory Pentahelix FGD
A multiparty forum to strengthen mangrove ecotourism management
- Date
- 16 Oct 2026
- Facilitator
- MARVEL facilitation team · Wahana Visi Indonesia
Dokumentasi Lokakarya Partisipatif Pengembangan SOP Ekowisata, Konservasi, dan Kolaborasi Pentahelix di Desa Sugian dan Desa Seruni Mumbul, Lombok Timur.
A digital report and learning hub for the three-day workshop that brought the communities of Sugian and Seruni Mumbul together with practitioners to shape mangrove ecotourism operating procedures, conservation rules and a fair financial model.
16–18 Oktober 2026 | Aston Inn Mataram
Three days, two coastal villages and six structured learning sessions.
The workshop is a three-day participatory process for the villages of Sugian and Seruni Mumbul in East Lombok. It brings village representatives, community groups, local government agencies and practitioners into one room to write down — together — how mangrove ecotourism should be run, what must be protected, and how the money should be shared.
Sessions are led by practitioners from BPSPL Denpasar, the East Lombok Search and Rescue agency and the MARVEL facilitation team. The method is deliberately practical: short technical inputs, followed by group work, simulation and joint drafting.
This portal documents that process and keeps its outputs available to the people who will implement them. Every document carries a status. A draft stays a draft until the village and the programme team say otherwise.
Three working days at Aston Inn Mataram. Session-to-day allocation is confirmed by the organising team and will be published on the Agenda & Timeline page.
Registration and opening, programme framing, and the participatory Pentahelix group discussion that sets the shared agenda.
Agenda to be confirmedEcotourism governance, mangrove conservation management, water rescue and ecotourism budgeting with invited practitioners.
Agenda to be confirmedIntegrated SOP simulation and decision-making workshop, action planning for both villages, and closing.
Agenda to be confirmedDiskusi berjalan dalam kelompok kerja: setiap sektor memetakan penggunaannya sendiri, lalu membandingkan hasilnya di ruang yang sama.
Six sessions form the technical core of the workshop. Each one is documented with its materials, method, discussion results and outputs.
A multiparty forum to strengthen mangrove ecotourism management
Institutions, mandates and accountability for a village ecotourism unit
Protecting the ecosystem the tourism depends on — and checking the map against reality
Safety procedures for guides, boats and visitors
What things cost, who decides, and how the income is shared
From notes to a procedure that survives a busy Saturday
Materi teknis dari praktisi, lalu langsung diterapkan pada materi desa masing-masing.
Keluaran lokakarya dicatat sebagai dokumen dengan status yang jelas: draft, dibahas, atau disahkan.
What the workshop produces, and how far each output has progressed. Statuses are updated as the documents move.
A structured registry of SOP-01 to SOP-12 covering the operational flow of mangrove ecotourism in both villages.
Village spatial plans that distinguish protection zones from tourism activity areas, with the original drawing preserved as the reference.
A proposed split of ecotourism income for Sugian, and an open agreement process for Seruni Mumbul.
A 30–60–90 day roadmap and monitoring arrangement for each village.
Two mangrove coastal villages, two separate SOP registers, two separate community agreements.
One of the two partner villages — mangrove coast, community tourism groups and the Sugian SOP register.
The second partner village — mangrove coast, community tourism groups and the Seruni Mumbul SOP register.
Dua desa, dua register SOP, dua peta konservasi — dengan status verifikasi yang dinyatakan terbuka.
The working documents that the villages will keep refining. Drafts are labelled as drafts — nothing here is presented as enacted.
Desa Sugian · indicative spatial function, facilities and protection
Desa Seruni Mumbul · three gates, indicative zones and protection
Alokasi hasil diskusi dicatat apa adanya, dengan penilaian kebijakan yang terpisah dari keputusan desa.
Setiap tindak lanjut punya pemilik, langkah pertama dan ukuran keberhasilan.
Tiga hari kegiatan dalam foto dokumentasi. Caption dan kredit dapat disunting tim dokumentasi.
Reports, SOP packages, maps and policies — downloadable, previewable and shareable.
No documents have been published yet. The library pages are ready — the documentation team uploads the PDFs from the admin dashboard, and the file stays available after publishing.
Lokakarya berakhir, tetapi dokumennya tetap terbuka untuk dibaca, dipakai, dan diperbaiki.
Every SOP, map and policy in this portal is downloadable as a PDF, with a permanent link you can share with your village team.